Remove all of the equipment from the Perma-Zyme Demo Kit and place on the table mat.
Take the Water Truck (bottle) of Perma-Zyme and fill the remaining space in the Water Truck (bottle) with water up to the fill line.
Once the Water Truck has been filled, gently agitate to mix the Perma-Zyme and water.
Using the Grader (Spoon) mix the soil and Perma-Zyme thoroughly until there are no dry spots in the soil.
Once the soil is throughly mixed with the Perma-Zyme begin placing the soil into the soil ring.
Slowly compact the soil using the Compactor (scraper). It is important to get all of the soil into the ring and ensure the soil is compacted completely into the ring.
Sit back and watch the soil cure and get stronger over time.
© 2024 Substrata LLC